Infraestructura industrial y equipos de generación eléctrica POWERTEC

MI Swaco

Generators from 200 to 500 kW and fuel tanks for more than 300 MI Swaco projects in Colombia.

The operational challenge

Serving projects spread across the national territory with generation and fuel-storage equipment suited to the operations of different companies in the energy sector.

The POWERTEC solution

  • Rental of generators with capacities between 200 kW and 500 kW.
  • Supply of fuel tanks for field operation.
  • Coverage for more than 300 projects in Colombia.
  • Support for operations linked to multiple companies in the sector.
The partnership has made it possible to meet electric generation needs in more than 300 projects across the national territory.

Result documented by POWERTEC in the official MI Swaco case. This is not presented as a direct client quote because the public source does not identify a spokesperson.

See original publication

Clients who operate with POWERTEC

Media, telecommunications, energy, oilfield services and the public sector back their electrical continuity with this equipment.

Logo de RTI, cliente de POWERTEC
Logo de RCN, cliente de POWERTEC
Logo de Caracol, cliente de POWERTEC
Logo de TELECOM, cliente de POWERTEC
Prabyc Ingenieros
SENA
Logo de ETB, cliente de POWERTEC
IPSE
TELEARMENIA
Logo de Ecopetrol–Schlumberger, cliente de POWERTEC
MI Swaco
Logo de Pacific Rubiales, cliente de POWERTEC
OXY
Hocol
Logo de Gran Tierra, cliente de POWERTEC
WOGSA
NGE
Logo de ONGC, cliente de POWERTEC
Logo de Petrex, cliente de POWERTEC
Logo de Saxon, cliente de POWERTEC
Logo de LATCO, cliente de POWERTEC

Let's talk about the power your project needs.

Request a quote